top of page

Saronic Selects Syncrolift to Design and Supply the World’s Largest Shiplift for Port Alpha

Writer: Karan Bhatia
Karan Bhatia
28 minutes ago
2 min read

Saronic, redefining maritime superiority, announced that it has contracted Syncrolift AS, a wholly owned subsidiary of Oslo-listed Nekkar ASA, to design and supply what will be the world’s largest shiplift for Port Alpha, the company’s next-generation shipyard under construction in Brownsville, Texas. 


The contract, valued at over USD 100 million, covers a 300-meter platform with a lifting capacity of 67,000 tonnes. The system will offer more than twice the lifting capacity of the next-largest installation, serving as a key operational asset for the new shipyard.


Port Alpha's shipyard will use a software-driven production model, with vessels moving between stations for large-block assembly. Syncrolift's tandem shiplift, equipped with digital-twin and condition-monitoring technology, will enable parallel shipbuilding on flat land, reducing the need for traditional dry docks while improving operational efficiency.


Saronic selected Syncrolift after an extensive evaluation of docking and transfer technologies, with its team assessing system capabilities and safety based on deep shiplift and shipyard expertise.


“Syncrolift’s technology and track record made them the right supplier to deliver a system that is strategically important to how we’re approaching Port Alpha and the reindustrialization of U.S. shipbuilding,” said Doug Lambert, Co-Founder and COO at Saronic. “The scope and scale of this shiplift is foundational to how the yard will operate and reflects the ambition of not only what we’re building at Port Alpha, but how we’re rethinking shipbuilding from the ground up to deliver ships at a speed and scale not seen in generations.”


“Saronic’s team knows shiplifts and shipyards, and that came through in our discussions about how vessels will move through Port Alpha. We’re proud they chose Syncrolift to deliver the world’s largest shiplift and to work with them on a system that will allow several ships to be built and outfitted on land in parallel, then moved to the lift when they’re ready to launch,” said Rolf-Atle Tomassen, Managing Director of Syncrolift AS.


Syncrolift will manage the project out of the company’s headquarters at Vestby, near Oslo, Norway.


Port Alpha represents an investment of over USD 3 billion and is expected to create up to 10,000 jobs. Spanning an initial 835 acres, with room to expand to nearly 4,400 acres, the shipyard will build autonomous and manned vessels for commercial and defense customers, creating opportunities for global suppliers to support the maritime industry's growth.


The Syncrolift contract, announced alongside the Atlantic Future Forum, highlights Saronic's approach of strengthening the US maritime industrial base while creating economic opportunities for allied and partner industries.


“Syncrolift is a key international supplier that Saronic is proud to support as it brings the best of the world’s maritime technology to bear while ushering in a modern era of global shipbuilding,” said Lambert.

bottom of page